Operationally Available Capacity

TSP Name: Adelphia Gateway
TSP: 081273189
Posting Date/Time: June 24, 2024 02:59 PM CT
 
Eff Gas Day/Time: June 23, 2024 10:00 PM CT
Cycle Indicator Description: Intraday 3
Capacity Type Description Operationally available capacity
<< Previous Day Next Day >>
Location Name Loc Loc Zn Loc Purp
Desc
Loc/QTI Flow Ind All Qty
Avail
Design
Capacity
Operating
Capacity
TSQ OAC IT
Indicator
Qty
Reason
Col-Claymont Claymont 3 Delivery Location RDQ D Y 400,000 75,000 0 75,000  
Claymont 3 Receipt Location RDQ R Y 0 0 0 0 N
Col-Gilbert Hellertown 1 Delivery Location RDQ D Y 0 0 0 0  
Hellertown 1 Receipt Location RDQ R Y 192,000 192,000 25,000 167,001  
LMBE North B LMBEB 2 Delivery Location RDQ D Y 104,000 104,000 69,860 34,140  
LMBE North_A LMBEA 1 Delivery Location RDQ D Y 108,846 108,846 22,963 88,243  
MCSES North B MCSESB 2 Delivery Location RDQ D Y 287,063 287,063 94,810 204,230  
MCSES North_A MCSESA 1 Delivery Location RDQ D Y 74,309 74,309 65,395 26,023  
PECO-Tilghman Peco-Tilghman 3 Delivery Location RDQ D Y 50,000 50,000 8,499 41,502  
Tetco QuakerTown Quakertown 1 Delivery Location RDQ D Y 0 150,000 0 321,367  
Quakertown 1 Receipt Location RDQ R Y 262,950 262,950 128,500 153,953  
Tetco West Rockhill West Rockhill 3 Delivery Location RDQ D Y 0 20,000 0 30,054  
West Rockhill 3 Receipt Location RDQ R Y 450,000 244,244 8,508 235,735  
TM-North A Transfer North A Zone TM 1 Delivery Location RDQ D Y 250,000 250,000 0 250,000  
TM-South Transfer South Zone TM 3 Receipt Location RDQ R Y 250,000 250,000 0 250,000  
Transco Lower Mud Run North A LMR A 1 Delivery Location RDQ D Y 0 30,000 0 108,059  
LMR A 1 Receipt Location RDQ R Y 252,000 252,000 62,750 193,150  
Transco Lower Mud Run North B LMR B 2 Receipt Location RDQ R Y 360,115 350,701 165,000 197,701  
Transco Ridge West Ridge 3 Delivery Location RDQ D Y 400,000 244,000 0 244,000  
West Ridge 3 Receipt Location RDQ R Y 0 20,000 0 20,000  
UGI Easton Road UGI Easton Road 1 Delivery Location RDQ D Y 192,000 144,000 127,590 20,306  


IT Indicator - An indicator which signifies whether or not interruptible transportation service is being utilized at this location.
  • Required if Capacity Type is 'Operationally available unscheduled capacity' and Quantity Available = '0'.
  • A value of Y = "At least a portion of the capacity being utilized at this location is interruptible"
  • A value of N = "There is not interruptible transportation service as a portion of the capacity being utilized at this location"
  • Will be blank if Quantity Available is not zero.

  • Measurement Basis Description: Million BTU's (Dth)
    Pressure Base Indicator Description: 14.73 Pounds Per Square Inch Absolute