Operationally Available Capacity

TSP Name: UGI Mt. Bethel Pipeline
TSP: 080176339
Posting Date/Time: July 5, 2024 08:55 PM CT
 
Eff Gas Day/Time: July 5, 2024 10:00 PM CT
Cycle Indicator Description: Intraday 3
Capacity Type Description Operationally available capacity
<< Previous Day Next Day >>
Location Name Loc Loc Zn Loc Purp
Desc
Loc/QTI Flow Ind All Qty
Avail
Design
Capacity
Operating
Capacity
TSQ OAC IT
Indicator
Qty
Reason
Allentown/Bethlehem MB006 1 Delivery Location RDQ D Y 72,000 72,000 24,000 48,000  
Transco MB001 1 Receipt Location RDQ R Y 72,000 72,000 24,000 48,002  


IT Indicator - An indicator which signifies whether or not interruptible transportation service is being utilized at this location.
  • Required if Capacity Type is 'Operationally available unscheduled capacity' and Quantity Available = '0'.
  • A value of Y = "At least a portion of the capacity being utilized at this location is interruptible"
  • A value of N = "There is not interruptible transportation service as a portion of the capacity being utilized at this location"
  • Will be blank if Quantity Available is not zero.

  • Measurement Basis Description: Million BTU's (Dth)
    Pressure Base Indicator Description: 14.73 Pounds Per Square Inch Absolute