Unsubscribed Capacity

TSP Name: Pine Prairie Energy Center, LLC
TSP: 187408526
Posting Date/Time: December 8, 2024 01:33 AM CT
 
Eff Gas Day December 8, 2024
End Eff Gas Day: December 9, 2024
Capacity Type Description Unsubscribed capacity available from the pipeline
<< Previous Day Next Day >>
Location Name Loc Loc Zn Loc Purp
Desc
Loc/QTI Design
Capacity
Unsub Cap
Acadia 33333 N/A Withdrawal Point SWQ 220,000 129,998
ANR_ML2 490941/490940 N/A Injection Point SIQ 600,000 558,500
490941/490940 N/A Withdrawal Point SWQ 600,000 222,500
ANR_SE 766185/766184 N/A Injection Point SIQ 600,000 505,000
766185/766184 N/A Withdrawal Point SWQ 600,000 168,000
CGT_Mainline 4205 N/A Injection Point SIQ 900,000 553,000
4205 N/A Withdrawal Point SWQ 900,000 660,000
Coughlin 55555 N/A Withdrawal Point SWQ 150,000 79,999
FGT_ZN2 78457/78456 N/A Injection Point SIQ 400,000 -100,000
78457/78456 N/A Withdrawal Point SWQ 400,000 -100,000
KM LA Pipeline 44404 N/A Injection Point SIQ 900,000 530,000
44404 N/A Withdrawal Point SWQ 900,000 730,000
TETCO_WLA 75524 N/A Injection Point SIQ 600,000 345,000
75524 N/A Withdrawal Point SWQ 600,000 164,000
TGP_800L 421043 N/A Injection Point SIQ 900,000 587,000
421043 N/A Withdrawal Point SWQ 900,000 0
Transco Z3 9003442 N/A Injection Point SIQ 900,000 400,000
9003442 N/A Withdrawal Point SWQ 900,000 -72,000
Tx_Gas_SL 9115 N/A Injection Point SIQ 900,000 708,500
9115 N/A Withdrawal Point SWQ 900,000 672,500


Measurement Basis Description: Million BTU's (Dth)
Pressure Base Indicator Description: 14.73 Pounds Per Square Inch Absolute