Operationally Available Capacity

TSP Name: Arkoma Connector Pipeline
TSP: 830730599
Posting Date/Time: July 12, 2024 07:41 AM CT
 
Eff Gas Day/Time: July 11, 2024 10:00 PM CT
Cycle Indicator Description: Intraday 3
Capacity Type Description Operationally available capacity
<< Previous Day Next Day >>
Location Name Loc Loc Zn Loc Purp
Desc
Loc/QTI Flow Ind All Qty
Avail
Design
Capacity
Operating
Capacity
TSQ OAC IT
Indicator
Qty
Reason
Arkoma No. 1 873882 1 Receipt Location RDQ R Y 638,000 601,000 293,345 307,646  
Bennington/Gulf Crossing 742490 1 Delivery Location RDQ D Y 638,000 601,000 335,139 266,564  
Bennington/MidContinent Express 892267 1 Delivery Location RDQ D Y 638,000 601,000 36,999 564,001  
Bennington/NGPL 126-07-49 1 Delivery Location RDQ D Y 160,000 150,000 0 150,000  
Tall Oak TOC 1 Receipt Location RDQ R Y 280,000 280,000 81,583 199,120  


IT Indicator - An indicator which signifies whether or not interruptible transportation service is being utilized at this location.
  • Required if Capacity Type is 'Operationally available unscheduled capacity' and Quantity Available = '0'.
  • A value of Y = "At least a portion of the capacity being utilized at this location is interruptible"
  • A value of N = "There is not interruptible transportation service as a portion of the capacity being utilized at this location"
  • Will be blank if Quantity Available is not zero.

  • Measurement Basis Description: Million BTU's (Dth)
    Pressure Base Indicator Description: 14.73 Pounds Per Square Inch Absolute