Operationally Available Capacity

TSP Name: UGI Sunbury, LLC
TSP: 080241225
Posting Date/Time: August 13, 2024 09:06 PM CT
 
Eff Gas Day/Time: August 13, 2024 10:00 PM CT
Cycle Indicator Description: Intraday 3
Capacity Type Description Operationally available capacity
<< Previous Day Next Day >>
Location Name Loc Loc Zn Loc Purp
Desc
Loc/QTI Flow Ind All Qty
Avail
Design
Capacity
Operating
Capacity
TSQ OAC IT
Indicator
Qty
Reason
Hummel SP015 1 Delivery Location RDQ D Y 180,000 180,000 172,497 0 N
Stagecoach SP005 1 Receipt Location RDQ R Y 200,501 200,501 141,000 59,501  
Transco SP001 1 Receipt Location RDQ R Y 200,501 200,501 38,194 139,995  
UGI-CPG SP010 1 Delivery Location RDQ D Y 20,000 20,000 6,500 13,500  


IT Indicator - An indicator which signifies whether or not interruptible transportation service is being utilized at this location.
  • Required if Capacity Type is 'Operationally available unscheduled capacity' and Quantity Available = '0'.
  • A value of Y = "At least a portion of the capacity being utilized at this location is interruptible"
  • A value of N = "There is not interruptible transportation service as a portion of the capacity being utilized at this location"
  • Will be blank if Quantity Available is not zero.

  • Measurement Basis Description: Million BTU's (Dth)
    Pressure Base Indicator Description: 14.73 Pounds Per Square Inch Absolute