Operationally Available Capacity

TSP Name: Gulf Shore Energy Partners, LP
TSP: 078770528
Posting Date/Time: April 17, 2025 01:11 PM CT
 
Eff Gas Day/Time: April 18, 2025 09:00 AM CT
Cycle Indicator Description: Timely
Capacity Type Description Operationally available capacity
<< Previous Day Next Day >>
Location Name Loc Loc Zn Loc Purp
Desc
Loc/QTI Flow Ind All Qty
Avail
Design
Capacity
Operating
Capacity
TSQ OAC IT
Indicator
Qty
Reason
FGT-MATAGORDA 454599 Delivery Location 2 D Y 100,000 100,000 79,438 20,562  
TGP-POOLE ROAD 467706 Receipt Location 1 R Y 100,000 100,000 79,438 20,562  


IT Indicator - An indicator which signifies whether or not interruptible transportation service is being utilized at this location.
  • Required if Capacity Type is 'Operationally available unscheduled capacity' and Quantity Available = '0'.
  • A value of Y = "At least a portion of the capacity being utilized at this location is interruptible"
  • A value of N = "There is not interruptible transportation service as a portion of the capacity being utilized at this location"
  • Will be blank if Quantity Available is not zero.

  • Measurement Basis Description: Million BTU's (Dth)
    Pressure Base Indicator Description: 14.73 Pounds Per Square Inch Absolute